Company Profile
Key Personnel
Technical Papers
Career Openings
Contact us
11/17/2008
1. TTI was awarded Remodeling of Storm Water Drains in Mahadevapura Zone for BBMP.2. TTI was awarded laying of Interceptor Sewer along Najafgarh, Supplementary and Shahdara drain for abatement of pollution in river Yamuna for CH2MHill.3.TTI has completed Water Audit, UFW and Condition Assessment Studies for IISC.4. TTI has completed Sewage Flow Measurement and Condition Assessment Studies for IISC.5.TTI has completed the GIS base mapping project for IISC.6. TTI has implemented GIS based Project Management for Sewer Rehabilitation Project for Delhi Jal Board.7. TTI has completed the cadestral mapping project for Italy8. TTI has bagged project for parcel mapping for various counties in USA.9. TTI has completed the project Designing of Water Supply,Sewerage,Storm Water Drainage for 16 settlements in Libya for area of 5100Ha.10. TTI has completed the project Designing of 2200mm Dia NeWater Supply PipeLine at Singapore.
Corporate Brochure
Trenchless Technology
1. “No Dig options for Sewer Rehabilitation in India” a joint presentation with Shyamal Sarkar of Word Bank at the seminar on the No-Dig Technology for Sewerage held in May 2001.
2. “No Dig Technology Options for Sewerage in Indian Context” presented at a Seminar on No-Dig, Technology for Sewerage at Mumbai, India in May 2001.
3. “Microtunnelling Technology and its Application in India for Sewer Construction” a joint paper with Shymal Sarkar of World Bank, N B Archrekar, Deputy Municipal Commissioner, Municipal Corporation of Mumbai, presented at conference by Indian Waterworks Association held at Bhopal India in April 2001.
4. “Technical Guidelines on Bidding Documents for a Microtunnelling Project in India” A Paper presented at the No-Dig 99 Conference by NASTT at Orlando USA May 1999.
5. “Guide lines for Technical Specification for Microtunnelling and Pipe Jacking Works” paper presented at The fourth National Conference on Trenchless Technology in Brisbane,Australia,May 1998.
6. “Slurry Shield Tunnelling in Siltstones and Cobble Stones: Australian Experience” with (Charles Difrancesco Of Nissho Iwai Australia Ltd), Proceedings of the International No-Dig 96 conference in New Orleans, Louisiana.U.S.A, April 1996.
7. “Slurry Shield Tunnelling and Pipe Jacking: Recent Experience” (with Charles Difrancesco of Nissho Iwai Australia Ltd and Masato Sato of Iseki Poly Tech Inc,Japan proceedings of the Third National conference on Trenchless Technology Perth,Australia, May 1996.
8. “Useful Lessons from Singapore’s experience of Microtunnelling” Proceedings of the Second Middle East No Dig Conference Held in Dubai, September 1994.
1. “Mechanical Shields for Trenchless Sewer Construction in Singapore” (with mohd Alami Musa) proceedings of the VIII Australian Tunnelling Conference held in Sydney,Australia, August 1993
2. “Trenchless Sewer Construction in an Urban Environment-Singapore’s Experience”, proceedings of the First National Trenchless Technology Conference held in Melbourne Australia, November 1992.
3. “Singapore Experience in Trenchless Technology and Its Potential For Use in the Developing Countries” proceedings of “World Water 89” Conference organized by the Institution of Civil Engineers,in London,November 1989.
4. “No Dig Sewers in Singapore by Microtunnelling Methods” proceedings of the Third International Conference and Exhibition on Trenchless Technology,Washington DC,USA,October 1988.
5. “Construction of Effluent outfall Pipeline in Tunnel Using Earth pressure Balance Shield (EPBS)”.proceedings of the Fifth International Geotechnical Seminar held at the Nanyang Technological Institute,Singapore, December 1987.
6. “Sewer Construction Methods in Singapore” published in the journal of the Institution of Engineers,Singapore, December 1986.