05/18/2009
1. TTI was awarded Remodeling of Storm Water Drains in Mahadevapura Zone for BBMP.2. TTI was awarded laying of Interceptor Sewer along Najafgarh, Supplementary and Shahdara drain for abatement of pollution in river Yamuna for CH2MHill.3.TTI has completed Water Audit, UFW and Condition Assessment Studies for IISC.4. TTI has completed Sewage Flow Measurement and Condition Assessment Studies for IISC.5.TTI has completed the GIS base mapping project for IISC.6. TTI has implemented GIS based Project Management for Sewer Rehabilitation Project for Delhi Jal Board.7. TTI has completed the cadestral mapping project for Italy8. TTI has bagged project for parcel mapping for various counties in USA.9. TTI has completed the project Designing of Water Supply,Sewerage,Storm Water Drainage for 16 settlements in Libya for area of 5100Ha.10. TTI has completed the project Designing of 2200mm Dia NeWater Supply PipeLine at Singapore.
Corporate Brochure
Download the PDF Project Sheets.
Australia
Sewer Amplification by Microtunnelling and Pipe jacking, Pernith Sydney, Australia.
1500mm Dia Gardiner's Creek Sewer Replacement Project, Melbourne, Australia.
35m Deep North Yarra Sewer Replacement by Microtunnelling and Pipe jacking Melbourne, Australia.
Installation of Sewers in Mumbai by Microtunnelling (Diameters from 350mm to 1400mm), Mumbai, India.
Rehabilitation of Sewers by Lining/Coating Method Rehabilitation Sewers by Pipe Bursting Method, Mumbai, India.
Rehabilitation of Sewers by Lining/Coating Method Rehabilitation Sewers (Phase II works) Contract SO-CA-5A.
Installation Sewers in Mumbai by microtunnelling (Diameter form 350mm to 1400mm)
Rehabilitation of Sewers for Delhi Jal Board CIPP Lining of 1600mm diameter sewers.
Refurbishment of Trunk sewerage System in Delhi by CIPP AND GRP Lining process.
Bulk Metering Monitoring System for Bangalore Water Transmission Network .
Augmentation of additional 100 MLD of water form CWSS Stage-IV Phase-1 in Bangalore.
Rehabilitation of Treatment Plant, Pump and Pipelines at CRS Water works TG Halli (30MGD)
Replacement and Rehabilitation of existing old (aged) water supply Pipeline up to 300mm dia and 30 years age in Bangalore.
Environmental Action Plan (B). Replacement / Rehabilitation of Existing Sewerage System in Bangalore.
Refurbishment of Trunk Sewers and Implementation of Related works in Delhi.
Condition-Assessment of Water Supply, Sewerage pipelines and GIS Based Mapping in Indian-Institue-Science in Bangalore.
National Program of Water Supply, Sewerage Systems and Storm Water for Tripoli Region, Libya (16 settlements).
3M Diameter Effluent out fall Pipeline by Earth Pressure Balance Shield Method
Preparation of detailed layout and profile for transmission main of size ranging from 900mm to 2200 for CH2ML Singapore.